91 days to 18 Feb 2027

October 6, 2026

The Battery Passport Checklist: Everything You Need Before February 2027

One checklist covering scope, data, suppliers, labelling, hosting and records, with the deadline that applies to each step and what to do if you are starting late.

This is the consolidated checklist for importers working towards 18 February 2027. Each step links to the detail behind it, so you can use this page as the plan and go deeper only where you need to.

1. Scope: know exactly what is caught

  • List every battery model you place on the market, including spare and replacement packs, not just the ones in finished products.
  • Classify each one. LMT batteries are in scope at any capacity. Industrial batteries are in scope above 2 kWh. Electric vehicle batteries are covered too.
  • Check the capacity for anything industrial, since that is what decides it.
  • Confirm the timing. The duty attaches to batteries placed on the market or put into service from 18 February 2027.

Detail: is my battery in scope, when a battery counts as placed on the EU market, and the scope checker.

2. Roles: confirm the duty is actually yours

  • Establish whether you are the importer for each model. If you buy from an EU supplier, you may not be.
  • Check the replacement-pack channel separately. Buying spares directly from the factory can make you an importer even when the vehicles come through a distributor.
  • Do not assume a supplier certificate transfers the duty. It does not.

Detail: who is responsible for the battery passport, e-scooter and LEV fleets.

3. Data: collect the Annex XIII set

  • Split the fields into what is yours and what only the manufacturer has.
  • Send one structured request per supplier, per model, with a deadline ahead of your own.
  • Ask for the evidence, not just the values, so each declared figure is defensible.
  • Escalate where the answer is a datasheet, including to the cell maker if your supplier assembles packs.
  • Never fill a gap with an estimate.

Detail: Annex XIII explained, what your supplier must send you, declare yourself vs supplier data, when a supplier only sends a spec sheet.

4. Access tiers: get the visibility right

  • Tag each field with its tier as you collect it.
  • Review the public tier carefully, since it is what anyone scanning the battery will see.
  • Keep restricted fields restricted, particularly detailed composition.
  • Build the middle tier so it can change, because the list of who qualifies as having a legitimate interest is still being written.

Detail: battery passport access tiers, the access-rights deadline has slipped.

5. Labelling and the data carrier

  • Confirm QR placement with the plant. The code goes on the battery itself unless its size or nature genuinely prevents it.
  • Generate passports before artwork goes to print, because the code needs a real, stable address.
  • Schedule the marking change into a production run, not after one.
  • Check the separate collection symbol is present and correctly sized.

Detail: the data carrier and QR code rules.

6. Hosting: plan for the long term

  • Decide who hosts and confirm they can keep records reachable for the life of the battery.
  • Fix the web addresses so printed codes never break.
  • Plan for handover if you change provider or retire a product line.
  • Upload the unique identifier to the EU registry established under the Ecodesign for Sustainable Products Regulation. The passport data stays with you; the identifier goes to the registry.

Detail: how long a battery passport must stay online, the EU central battery passport registry.

7. Records and the wider conformity duties

  • Keep the EU declaration of conformity for ten years.
  • Verify CE marking and labelling before placing a battery on the market.
  • Put your own name, trade mark and postal address on the battery.
  • Keep the passport data on file, not only in the passport.

Detail: importing batteries from China, how the passport, CE marking and UN 38.3 fit together.

8. After launch

  • Keep passports accurate as models and suppliers change.
  • Watch the pending Commission acts, particularly on access rights and labelling, since some dates follow those acts rather than a fixed day.
  • Keep passports live for batteries already sold.

Detail: what happens if your battery has no passport by February 2027.

If you are starting late

Do them in this order, because it is the order of lead times:

  1. Scope, because it tells you the size of the job.
  2. The supplier request, because it is the longest pole and depends on someone else.
  3. Marking, because it depends on a production schedule.
  4. Hosting and publication, which is the part most within your control.

In short

Scope your range, confirm the duty is yours, collect the Annex XIII data with its evidence, tier it correctly, get the QR code onto the battery via a production run, host it somewhere stable for the long term, and keep the conformity records. If time is short, start with scope and the supplier request, because those two depend on other people and everything else does not.